Journal Articles

Beam test of a new RFQ for the J-PARC linac

Kondo, Yasuhiro; Morishita, Takatoshi; Yamazaki, Saishun; Hori, Toshihiko; Sawabe, Yuki; Takagi, Akira*

Proceedings of 27th International Linear Accelerator Conference (LINAC 2014) (Internet), p.267 - 269, 2014/12

We performed a beam test of a new 324-MHz 3-MeV H$$^{-}$$ RFQ (RFQ III) for the beam-current upgrade of the J-PARC linac. RFQ III is the first RFQ developed to meet the requirement of the J-PARC linac. The peak beam current is 50 mA, pulse length is 500 micro-sec, and the repetition is 25 Hz. Prior to the installation to the accelerator tunnel in summer of 2014, we constructed a test stand for off line testing of the new ion source and RFQ. Basic performances of RFQ III such as transmission and emittances were measured. In this paper, the beam test results are presented.

Journal Articles

Installation and performance check of beam monitors for energy upgraded J-PARC linac

Miura, Akihiko; Ouchi, Nobuo; Oguri, Hidetomo; Hasegawa, Kazuo; Maruta, Tomofumi*; Liu, Y.*; Miyao, Tomoaki*; Ikegami, Masanori*

Proceedings of 27th International Linear Accelerator Conference (LINAC 2014) (Internet), p.1059 - 1061, 2014/12

An energy upgrade project has started in the J-PARC Linac since 2009. In the upgraded project, beam energy in the Linac has increased from original 181 MeV to 400 MeV using the additional 21 Annular-ring Coupled Structure Linac (ACS) cavities. The new beam monitors as the beam current monitors, the phase monitors, the beam position monitors and the transverse profile monitors (wire scanner monitors) were designed and fabricated. By the end of November, 2013, all beam monitors were completely installed. From the middle of December, we started the beam commissioning to achieve the beam energy as 400 MeV, as well as to confirm the beam monitor functioning. We achieved the 400 MeV beam acceleration at the middle of January, 2014 using newly installed beam monitors. This paper describes the beam monitor installation and the beam commissioning results of beam monitor functioning.

Journal Articles

Development of superconducting spoke cavity for electron accelerators

Kubo, Takayuki*; Saeki, Takayuki*; Cenni, E.*; Fujisawa, Hiroshi*; Iwashita, Yoshihisa*; Tongu, Hiromu*; Hajima, Ryoichi; Sawamura, Masaru

Proceedings of 27th International Linear Accelerator Conference (LINAC 2014) (Internet), p.1030 - 1033, 2014/12

A 325 MHz superconducting spoke cavity for the electron acceleration is under development to realize a compact industrial-use X-ray source with the laser-Compton scattering. Optimum designs of the spoke cavity have been searched by using the genetic algorithm, and multipactor simulations are currently in progress to finalize the detailed design. In parallel to the design-optimization efforts, studies toward fabrication processes are also being carried out. In this paper, progresses made so far and a current situation are briefly reviewed.